Сборник задач по подготовке учащихся к международным исследованиям timss и pisa



Pdf көрінісі
бет113/115
Дата12.10.2022
өлшемі3,47 Mb.
#152700
түріСборник задач
1   ...   107   108   109   110   111   112   113   114   115
Байланысты:
Тимс,Пизаға дайындық

Task 15. Accommodation repair
Repairing an office is
required . Aydos does this job in three days. Yerbol does 
the same job in four days and Meyram in 5 days. Give your answer for the following 
questions. 
Question 1. How much time do they do this work together? (Choose the correct 
answer). 
Answer ___________. 
Question 2: How long does it take, if the first third part of it would be fulfill by 
Aidos, then the half of the remaining part by Yerbol, and the rest of it by Meyram? 
Answer ___________. 
Question 3: Who does the work faster: Aidos, working alone or Erbol and 
Meyram working together? 
Answer ___________. 
Task 16. Mountains. 
Table 6 gives the information about the highest mountains of each continent. 
Using these data find the height of the mountains and fill in the table 
Table 16. 
 
mountains
 
mountains
 
Data 
high
Everest 
Asia 
8852 m 
Aconcagua 
South America 
The height of Mount Aconcagua 
is of the height of Mount Everest 
McKinley 
North America 
Mount Aconcagua is 765 meters 
higher than the Mc Kingsley 
mountain 
Kilimanjaro 
Africa 
The height of Mount Kilimanjaro 
ais 299 cm less than the height of 
Mount Mc Kingsley 
Elbrus 
Europe 
6642 m 
Sentinel Range 
in the Massif Vinson 
Antarctica 
Heights of the Sentinel Range is t 
3575 times lower than the 
difference between the heights of 
the mountains Aconcagua and 
Elbrus 
Kosciusko 
Australia 
The height of Mount Kosciuszko 
at 2664 m less than the height of 
the Sentinel Range 
Task 17. The design of the walls. 


174 
Question 1. What is the area of the wall? 
Answer ___________. 
Question 2. What is the area of one tile? 
Answer ___________. 
Question 3. Approximately how many tiles are needed for this wall? 
Answer ___________. 
Question 4. How many unbroken tiles are needed to make tile pattern 
symmetrical? 
Answer ___________. 
Task 17. Design. 
The length of the lozenge-shaped figure is 45cm. This figure should be designed 
with a rhombus drawing. (Figure 3). 
Question 1. What is the area of this figure? 
Answer ___________. 
Question 2. How many centimeters should be the length of the tile to fill in this 
figure? 
Answer ___________. 
Task 19. Movement. 
Cyclist was riding 4 hours at a speed of 18 km / h. 
Question 1: How much speed must he increase to ride the same way in the 0.5 
hour faster? 
Answer: 
_____________________________________________________________ 
Question 2: How does the time change if he will pass this distance at a speed of 
20 km / h? 
Answer __________/ 


175 
Task 20. Age. 
Father’s and son’s age totally is 30, son’s and grandfather’s one together is 60 
years, and his father’s and grandfather’s one together is 84 years. 
Question. How old is the father, son and grandfather separately? 
Answer: _________________________________________________________. 


Достарыңызбен бөлісу:
1   ...   107   108   109   110   111   112   113   114   115




©engime.org 2024
әкімшілігінің қараңыз

    Басты бет