240
line connection or storage container (tank) is connected to the well to facilitate
transportation or store the product. In the case of natural gas, which cannot be
stored easily, a pipeline connection is necessary before the well can be placed
on production.
Christmas tree
In many oil and gas wells, one additional step is required — stimulating the
formation by physical or chemical means so that the hydrocarbons can move
more easily to the wellbore through the pores or fractures into the reservoir.
This is usually done before installing a pump or when the pump is removed for
maintenance. Some forms of stimulation such as acidizing and fracturing are
commonly employed if required.
Достарыңызбен бөлісу: